DARMIS.AI · WORKFLOW INTELLIGENCE LAYER
OPERATIONAL VERSION  |  PRODUCTION READY
THE WORKFLOW INTELLIGENCE LAYER
FROM INTAKE
TO QUOTE
IN MINUTES,
NOT DAYS.
Transforming incoming documents, forms, and operational inputs into validated, governable, and optimizable business decisions.
DECK
INTAKE TO DECISION
STATUS
PRODUCTION READY
CONFIDENCE
0.97
DATA INTEGRITY
VERIFIED
▲ MANDATE
INFO → DECISION SUPERIORITY
02
AGENDA · SECTION INDEX
OPERATIONAL VERSION  |  PRODUCTION READY
AGENDA
Wayfinding for the dossier ahead. Three sections, sequenced for decision.
S01

CURRENT STATE

Where intake-to-decision sits today across the workflow.

P. 03–07
S02

SOLUTION

The target architecture and operational impact.

P. 08–10
S03

ENGAGEMENT / CLOSE

Final decision prompt and follow-up path.

P. 11–12
SECTION
FRONT MATTER
STATUS
PRODUCTION READY
PAGES
12 TOTAL
DATA INTEGRITY
VERIFIED
▲ MANDATE
A1 / COMPLIANT
S01 SECTION SEPARATOR
CURRENT
STATE
Where the current process breaks down.
PAGES 04–07  ·  4 SLIDES  ·  PROBLEM SPACE
SECTION
CURRENT STATE
STATUS
PRODUCTION READY
CONFIDENCE
0.97
DATA INTEGRITY
VERIFIED
▲ MANDATE
INFO → DECISION SUPERIORITY
04
CURRENT STATE · PROBLEM OVERVIEW
OPERATIONAL VERSION  |  PRODUCTION READY
WHERE THE CURRENT PROCESS BREAKS DOWN
ONE BROKEN PIPELINE.
THREE STRUCTURAL BREAKDOWNS.
FIG. 01 / WHERE THE CURRENT PROCESS BREAKS DOWN — DOCUMENTS · REVIEWERS · DECISION OUTPUT
Documents funneled through three reviewers to a decision output
FLOW · 01 INTAKE

EXTRACTION

Documents arrive faster than humans can extract them.

FLOW · 02 VALIDATION

QUALITY

Inconsistent checks let bad data slip through.

FLOW · 03 RULES

OVERSIGHT

Decisions visible only after losses are taken.

SECTION
CURRENT STATE / 01
STATUS
PRODUCTION READY
CONFIDENCE
0.92
DATA INTEGRITY
DEGRADED
▲ MANDATE
DIAGNOSE BEFORE DEPLOYING
05
ISSUE 01 · INTAKE / EXTRACTION / DATA GATHERING
OPERATIONAL VERSION  |  PRODUCTION READY
ISSUE 01 · INTAKE
WHY ARE YOUR EXPERTS
CHASING DOWN DATA?
High-cost domain experts re-key figures from PDFs instead of pricing risk. The data is there — it's just not reachable.
Stacked documents locked away from a profile card
BREAKDOWN · 01

TRAPPED DATA

Critical inputs locked inside PDFs, scans, and email attachments.

Analyst re-keying data from documents into a form
BREAKDOWN · 02

MANUAL RE-ENTRY

Underwriters retype the same fields across systems by hand.

Expert reviewing scattered context and weighing decisions
BREAKDOWN · 03

YEARLY DATA HUNT

Context is reconstructed from fragments because intake was never captured cleanly.

SECTION
CORE PROBLEMS / 01
STATUS
PRODUCTION READY
CONFIDENCE
0.92
DATA INTEGRITY
DEGRADED
▲ MANDATE
RECLAIM EXPERT TIME
06
ISSUE 02 · VALIDATION / DATA QUALITY
OPERATIONAL VERSION  |  PRODUCTION READY
ISSUE 02 · VALIDATION
BAD DATA SLIPS
THROUGH THE CRACKS.
FIG. 03 / VALIDATION CONVEYOR — VALIDATED + UNVALIDATED PATHS
Conveyor diagram showing validated and unvalidated data paths converging into mixed output
VAL · 01

INCOMPLETE

Submissions missing fields move forward anyway.

VAL · 02

INCONSISTENT

Same submission, different judgements at different desks.

VAL · 03

OPAQUE

No reconstruction of who validated what, when, or why.

SECTION
CORE PROBLEMS / 02
STATUS
PRODUCTION READY
CONFIDENCE
0.74
DATA INTEGRITY
DEGRADED
▲ MANDATE
RESTORE TRUST IN INPUTS
07
ISSUE 03 · RULES / DECISIONS / OVERSIGHT
OPERATIONAL VERSION  |  PRODUCTION READY
ISSUE 03 · RULES
DECISIONS BECOME VISIBLE
ONLY AFTER LOSS.
FIG. 04 / UNGOVERNED DECISION FLOOR — IDENTICAL INPUT, THREE OUTCOMES
Three reviewers receiving identical data and producing flagged, cleared, and rejected outcomes
BREAK · 01

INCONSISTENT

Same scenario, different decisions across teams and quarters.

BREAK · 02

UNDOCUMENTED

Override after override, none captured and none reviewable.

BREAK · 03

POST-LOSS

Decisions surface to leadership only after the financial event.

SECTION
CORE PROBLEMS / 03
STATUS
PRODUCTION READY
CONFIDENCE
0.68
DATA INTEGRITY
UNVERIFIED
▲ MANDATE
DECISIONS BEFORE LOSS
S02 SECTION SEPARATOR
OUR
SOLUTION
Intelligent intake-to-decision orchestration — the workflow intelligence layer.
PAGES 09–14  ·  6 SLIDES  ·  SOLUTION
SECTION
SOLUTION
STATUS
PRODUCTION READY
CONFIDENCE
0.97
DATA INTEGRITY
VERIFIED
▲ MANDATE
INFO → DECISION SUPERIORITY
09
SOLUTION · UNIFIED INTAKE‑TO‑DECISION ARCHITECTURE
OPERATIONAL VERSION  |  PRODUCTION READY
FIVE STAGES · TARGETED OVERSIGHT · IMMUTABLE AUDIT
REVIEW ONLY WHAT
ACTUALLY NEEDS ATTENTION.
FIG. 05 / UNIFIED INTAKE‑TO‑DECISION ARCHITECTURE
Five-stage pipeline with targeted human oversight layer above and immutable audit foundation below
DETAIL — SYSTEM PARTS · P. 19
LAYER · ABOVE

TARGETED OVERSIGHT

Senior reviewers see only the cases that need judgement.

LAYER · CORE

FIVE STAGES

Intake · Validate · Rules · Decide · Audit, every step typed.

LAYER · BELOW

IMMUTABLE AUDIT

Every input, rule, override and outcome travels with provenance.

SECTION
SOLUTION / 02
STATUS
PRODUCTION READY
CONFIDENCE
0.97
DATA INTEGRITY
VERIFIED
▲ MANDATE
ALL STAGES AUDITABLE
10
SOLUTION · OPERATIONAL IMPACT
OPERATIONAL VERSION  |  PRODUCTION READY
WHAT CHANGES THE DAY YOU DEPLOY
FROM INTAKE TO QUOTE,
IN MINUTES.
Pilot-verified on standard submissions. Audit-ready by default, not by archaeology.
CYCLE‑TIME REDUCTION
90%

From days to minutes on standard submissions — your team focuses on the cases that need judgement.

SOURCE · PILOT BENCHMARK · STANDARD COHORT N=240
DECISION TRACEABILITY
100%

Every input, rule, override, and outcome captured. Audit-ready by default, not by archaeology.

SOURCE · DECISION-LOG SCHEMA · PRODUCT SPEC §4.2
▲ EXPERT LEVERAGE

Senior reviewers spend their day on the 5% of submissions that actually need them. The other 95% clear themselves.

SOURCE · REVIEWER QUEUE TELEMETRY · 12-WEEK WINDOW
SECTION
SOLUTION / 03
STATUS
PRODUCTION READY
CONFIDENCE
0.94
DATA INTEGRITY
PILOT‑VERIFIED
▲ MANDATE
DECISIONS BEFORE LOSS
S03 SECTION SEPARATOR
NEXT
STEPS
A focused 90-day path from pilot to production.
PAGES 16–17  ·  2 SLIDES  ·  ENGAGEMENT
SECTION
NEXT STEPS
STATUS
PRODUCTION READY
CONFIDENCE
0.96
DATA INTEGRITY
VERIFIED
▲ MANDATE
90 DAYS · PILOT → PRODUCTION
12
CLOSE · END OF DOSSIER
OPERATIONAL VERSION  |  PRODUCTION READY
END OF DOSSIER
THANK
YOU.
Questions, pilots, or a deeper architecture review — we're ready when you are.
OPERATIONAL
SECTION
CLOSE
STATUS
PRODUCTION READY
CONFIDENCE
0.97
DATA INTEGRITY
VERIFIED
▲ MANDATE
INFO → DECISION SUPERIORITY